Project Results
-
Basketball Stadium
- Energy savings of ~55%
- Considerable lux gains have been achieved to an average of 350 lux
- More natural daylight colour and consistent light levels across the courts Requatic Centre
- Achieved ~75% energy savings
- Lux levels have been considerably improved in all areas
- Upgrade has provided a more modern appearance, uniform lighting and customer satisfaction
Kwinana City Council, WA
Project: December 2012
Kwinana Recreation Centre, (Indoor aquatic centre and indoor basketball stadium) – Kwinana, WA
Dolphin Lighting provided a full product and installation solution to upgrade both the indoor aquatic centre and indoor basketball stadium.
Formal lighting design plans were drawn up to ensure all areas lighting levels were improved in line with Australian Standards, whilst achieving significant energy savings.
Products utilised
-
Basketball Stadium
- 130W LED Hi-Bays – replacing both 250W and 400W Metal Halide hi-bays
- 250W LED Hi-Bays – replacing 400W Metal Halide Hi-Bays Requatic Centre
- 40W LED Floodlights – replaced 400W Mercury Vapour floods
- 100W LED Floodlights – replaced 400W Mercury Vapour floods
- 250W LED Floodlights – replaced 1,000W Metal Halide floods
- 55W 10” Round LED Commercial Downlights – replaced 150W Metal Halide downlights
RECENT PROJECTS
LED Sign Lighting ExamplesPickles Auctions
Centurion Transport
Peel Health Campus
Kingsize Big & Tall
Quentin Broad Outdoor Swimming Pool – Solar Lighting
Cockburn Gateway Shopping Centre
Maribyrnong Aquatic Centre
Gemco Rail
City Of Canning
City Of Perth
Gemini Accident Repair
St John Ambulance
Super Amart
RecWest Sports Stadium
Vinidex
Footscray Library
Smash Repair Spray Paint Booth
Flower Clothing
Kwinana Recreation Centre
Murdoch University
Aurizon / QR National
Australian Wool Testing Authority
Thirsty Camel
Hertz Truck Rental
Maribyrnong City Council
Residential and Garden